Breadcrumb
- Home
- Port & Terminal Restrictions
Port & Terminal Restrictions
Terminal Limitation:
Terminal Facilities |
Limitation |
Gantry Cranes |
4x45 MT QGC (Quay Gantry Crane) Average productivity: 15~20/gantry/hour |
Straddle Carrier |
Max. Capacity 35 Tons and RTG (25 Nos capacity 40 tons) |
Reefer Plug |
400 Reefer Plug available – additional 250 Plugs can be extended. |
Container Berths:
Container Berth |
Limitation |
There are two terminals interconnected by a small bridge in between a. GCB (General Cargo Berths) b. CCT (Chittagong Container Terminal) & NCT (New Mooring Container Terminal) |
|
GCB (General Cargo Berth) |
• 12 Jetties in Total • 6 allocated for Container Feeder Vessel • No Shore Gantry Cranes • Loading/Unloading performed by using Ship’s gear. • Gearless Container Vessel not permitted. • Maximum permissible draft is 8.55 M |
CCT (Chittagong Container Terminal) |
• 3 Jetties in Total • 2 allocated for Container Feeder Vessel • 4 QMGC (Quay Mounted Gantry Crane) Loading/Unloading performed by Ports Gantry Crane. • Maximum permissible draft is 9.15 M |
NCT (New Mooring Container Terminal)
|
• 5 Jetties in Total • 4 Berths available for Container Feeder Vessel. • No Shore Gantry Cranes. • Loading/Unloading performed by using Ship’s gear. • Gearless Container Vessel not permitted. • Maximum permissible draft is 9.15 M |
To download the information, click here.